Special Structure Work

This is principally the design and build of a cable protection system for river and stream crossings, as each bridge is unique.  It has also covered tunnel work.

Bridge Crossing – Te Puke – 2008

R200 crossing rail bridge – Te Puke – 2008

A Cable complete over bridge – Te Puke – 2008

FibreOptic Cable – Te Puke – 2008

FibreOptic through Kaimai Tunnel

Fixing FibreOptic through Kaimai Tunnel